Rapid Assembly
Following a detailed site survey, pre finished steel faced panels
are sent to the site, manufactured to the correct sizes. They
require no wet trades such as plastering, painting, etc and hence
cause minimal disruption to the surrounding environment.
Wall and ceiling
panels have a tongue and groove profile and are fixed to each
other with mechanical camlocks at approximately 1m centres. Walls
are fixed into steel base channels or fixed to optional floor
panels. Ceiling/wall joints have preformed profiles that are
simply dropped into place and fixed by steel angles. All joints
are sealed with intumescent mastic (that swells under heat) between
the panels and silicon mastic to seal against water.
This construction
forms an immensely strong box to withstand external attack and
the pressures generated by fire suppression gases (note that
some gases do need additional overpressure facilities that we
can also provide).
- A small room can be constructed in a single day.
- A 500sq
metre space can be ready for fit out commencement in 2-3 weeks.
Finishing (trims, sealant, etc) can be done in parallel with
other trades and doors are normally fitted towards the end
of the project to allow free access.
|
|
Remtech - leading the way in high-speed computer
room construction.
"Remtech showed outstanding
performance in speed, quality and flexibility in the core
construction of our new 3,000 sqm Data Centre." ...more.
|